Sync Item Resource Planning Replenishment Method to Item Engineering

Summary of Requirement

ACME has found that their Item Engineering Data and their Item Resource Planning records are not in sync. ACME would like the Item Engineering Data window “BOM Should Treat As Field” to be the master control for setting the Replenishment Method in Item Resource Planning. The Item Resource Planning Replenishment Method for Default Values and all assigned Sites should match the Item Engineering Data Card.

Design Specification

View design specification CR0632