Engineer To Order Release 2019-07-30

V12.1.33 / 14.1.16 / 16.1.9 / 18.1.5
* ME: (1) Added reports for Estimated Quantities, Router, and Other Costs. (2) Addressed duplicate key error caused by copying an ME BOM to a new ME BOM where the BOMID being used would create a duplicate of a subassembly BOM (#20192452)

The PRINT button on the Mfg Estimation window used to print a Bill of Material report.  It now opens the new Print Options window shown below.

Print Options provides access to the original Bill of Material report along with the three new reports (Routing, Other Costs, and Estimation Quantities).