V12.4.157 / 14.4.104 / 16.4.70 / 18.4.31 / “GP Next”
* Proposed Cost Update: (1) added update options for “Last Cost”, “First Cost” and “Custom”. The last option uses new stored procedures that can be modified to add any desired custom business logic to return the Proposed Cost, Fixed Overhead Cost and Variable Overhead Cost. (2) Added a GoTo button to open the Manufacturing Standard Cost Changes window directly from Proposed Cost Update.