Summary of Requirement
ACME Co. places MO’s in the system with an Open status many months before production begins so that the MO can drive MRP and scheduling.
During the time between when the MO is first created and when it is Released to begin production, engineering changes may occur to the Routing.
ACME Co. needs to refresh the Working Routing from the current Item Routing when the MO is Released.
Design Specification
View design specification CR0496