V12.0.27 / 14.0.10 / 16.0.3 Changes 20-SEP -16
- Accept Estimate: (a) routine was not copying the Lead Time Offset and Offset From settings to the new BOM, (b) when creating a new finished good item, the Standard Cost Changes window will open automatically so user can perform a cost rollup.