Summary of Requirement
ACME Co’s Purchasing department procures material both domestically and internationally. They require the ability to update the Purchasing Line Item’s Required Date and have the system automatically update the Promised Ship Date and Promised Arrival Date. The date calculations should be calculated based on the Ship Method selected.
Design Specification
View design specification DS0635